Somebody on your board has read that 95% of AI pilots fail. If you run distribution, you have probably been handed that number twice — once by a director who wants to slow a project down, and once by a vendor who wants to explain why their deployment is the 5%.
The number is real in the sense that a document containing it exists. It is not real in the sense that anyone measured it on a warehouse. I went and read the source. What follows is what it actually counted, and then the part nobody writes: what genuinely breaks between a successful pilot and a working deployment in a distribution center, from the seat that signs the capital request and owns the P&L six months later.
The document behind the number
The 95% comes from The GenAI Divide: State of AI in Business 2025, published in July 2025 by four authors under MIT’s Project NANDA. Its own front matter labels it “Preliminary Findings from AI Implementation Research from Project NANDA.” The methodology statement, verbatim:
This report is based on a multi-method research design that includes a systematic review of over 300 publicly disclosed AI initiatives, structured interviews with representatives from 52 organizations, and survey responses from 153 senior leaders collected across four major industry conferences.
Fifty-two interviews. A hundred and fifty-three survey responses recruited at conferences. It was never peer-reviewed and never claims to be — the only named reviewer is also one of the co-authors. Widely-circulated coverage described the research as “150 interviews with leaders, a survey of 350 employees, and an analysis of 300 public AI deployments” — roughly triple the real interview count and more than double the real survey count.
None of that is disqualifying on its own. Small qualitative studies are useful, and this one is candid about its limits. Its own research note reads:
These figures are directionally accurate based on individual interviews rather than official company reporting. Sample sizes vary by category, and success definitions may differ across organizations.
That is a fair description of a directional study. It is not a description of a benchmark. The problem is what happened to the arithmetic on the way out the door.
The denominator is wrong, and the report gets it wrong too
Here is the sentence everyone quotes, from the executive summary:
Despite $30–40 billion in enterprise investment into GenAI, this report uncovers a surprising result in that 95% of organizations are getting zero return.
And here, later in that same summary, is the funnel it rests on:
Sixty percent of organizations evaluated such tools, but only 20 percent reached pilot stage and just 5 percent reached production.
Read those together. Read literally, the 5% is a share of organizations — not of pilots. Only 20% ever piloted a custom tool at all. Of the organizations that actually ran a pilot, roughly a quarter got to production. That is a meaningfully different claim from “95% of pilots fail,” and it describes a procurement funnel, not a failure rate. Most of the 95% never started.
The report itself does not hold the distinction. The executive summary says “95% of organizations,” then in the same summary says “just 5% of integrated AI pilots are extracting millions in value.” By page seven it has become “the 95% failure rate for enterprise AI solutions.” Three denominators, one number.
Its definition of success is also stricter than any capital committee would use. Success is “deployment beyond pilot phase with measurable KPIs,” with ROI “measured 6 months post-pilot” and impact required to be “marked and sustained” — neither word defined. On that clock, a project that breaks even in month seven doesn’t register.
The document is inconsistent with itself on its own headline spending figure, too. Page ten states that “sales and marketing functions captured approximately 70 percent of AI budget allocation across organizations in our survey.” The takeaway printed directly above it, on the same page, says 50%.
It was never broken out by industry at all
This is the part that matters if you run a DC, and it takes about a minute to verify.
The report contains no sector-level failure rate. The 95% is never disaggregated by industry anywhere in the document. Searched end to end, the words logistics, warehouse, warehousing, freight, and industrial appear zero times. “Supply chain” appears exactly once, as a table row reading “Maintenance pilots; no major supply chain shifts.”
Manufacturing appears three times, in three unrelated sections — a quoted COO, a passing clause about budget allocation, and a quoted VP of operations. None of the three is a sector analysis. Separately: where the report does break investment down by function, it flags those breakdowns as “directional at best.”
So when the number is quoted at you in a distribution context, it is being applied to an industry the study did not separate out, using a denominator the study did not intend, from a document that calls itself preliminary.
One documentable fact about the paper’s history, with no motive attached: it was hosted at nanda.media.mit.edu/ai_report_2025.pdf, still returned HTTP 200 at 10:57 a.m. ET on 18 August 2025, and returned 404 by 1:28 p.m. ET the same day — as the coverage was going viral. That URL now redirects to the group’s overview page, and the report does not appear on Project NANDA’s own publications list. There is no retraction and no institutional statement in either direction. I could not find one, and its absence is worth stating plainly rather than filling in.
While we’re auditing: the other stat
The predecessor claim — “Gartner says 85% of AI projects fail” — is a corruption of a real sentence. The actual line, from a Gartner press release dated 13 February 2018, is:
Gartner predicts that through 2022, 85 percent of AI projects will deliver erroneous outcomes due to bias in data, algorithms or the teams responsible for managing them.
That is a forecast about biased outputs, not failed projects, and its window closed at the end of 2022. No Gartner publication I could find says 85% of AI projects fail.
The nearest citable modern equivalent is a July 2024 Gartner release predicting that “at least 30% of generative AI (GenAI) projects will be abandoned after proof of concept by the end of 2025, due to poor data quality, inadequate risk controls, escalating costs or unclear business value.” Note “at least” — it is a floor, not a point estimate. And note that this window has closed too, at the end of 2025, without anyone publishing the realized figure. That is the honest state of the evidence: two widely-quoted predictions, both expired, neither ever checked against an outcome.
What the government data actually shows about the physical economy
Here the picture gets clearer, and it is not a failure story.
The Census Bureau’s Business Trends and Outlook Survey added AI questions covering November 2025 through January 2026. A Census working paper analyzing them (CES-WP-26-25, April 2026) reports that 18% of firms used AI in at least one business function in that window, rising to 32% on an employment-weighted basis.
Then the number that reframes everything. The same paper reconstructs the older, narrower measure — AI used in producing goods or services — by combining the “production of goods” and “provision of services” function responses. That yields 6% for the prior six months. A footnote adds that because the 6% covers a six-month window rather than the two-week window used elsewhere, the true two-week rate “could be even lower.”
Eighteen percent of firms are using AI somewhere. Six percent, measured over a longer window, are using it to make or deliver anything.
The function-level ranking says the same thing. Among firms using AI in at least one business function, the paper reports sales and marketing at 52%, strategy and business development at 45%, IT at 41%, R&D at 40% — and then, verbatim: “Use in production and supply-related functions, quality control, and distribution are relatively less common.” Distribution sits in that bottom cluster. The underlying chart carries no data labels, so I am not going to publish a number for it.
By sector, the paper is equally direct: “sectors relying on physical output, such as Manufacturing, Construction, and Transportation and Warehousing, and trade sectors (Wholesale and Retail), have much lower adoption rates.” The Minneapolis Fed, reading the same supplement, put a bound on it: “Less than 10 percent of businesses in agriculture, transportation, accommodation and food services, and construction reported AI use.” For comparison, Census reported a national rate of 19.8% as of 3 May 2026, with Information at 39.7% and Finance and Insurance at 33.9%.
Depth is thin even among adopters: 57% of AI-using firms use it in three or fewer business functions, and 24% use it in exactly one.
The physical economy has not failed at AI. It has barely started. That is a different problem with a different fix, and it is the reason a 95% headline built mostly on knowledge-work deployments is close to useless as a planning input for a DC.
One caution on any adoption number you see quoted across time: BTOS changed its core question wording on 17 November 2025, from AI use “in producing goods or services” to use “in any of its business functions.” The measured rate roughly doubled across that break — the Census authors attribute the jump to the rewording plus two other factors, so no clean split is available. Numbers from either side of that date are not comparable, and plenty of decks splice them anyway.
So what actually breaks
The genuinely useful question isn’t why 95% of anything failed. It’s why a pilot that hit its numbers turns into a deployment that doesn’t. Six things, in rough order of how often I have watched them do the damage.
The pilot ran on the clean half of the work. Pilots get scoped to a lane, a customer, a product category — and almost always to the well-behaved one. The exceptions are the product. A slotting or put-away recommendation that is right 92% of the time is excellent in a pilot readout and a staffing problem in production, because somebody now has to work the 8%, and that somebody was never budgeted.
Nobody owns the exception queue. This is the single most reliable predictor I have seen. In a pilot, the exceptions route to the project team, who are motivated, temporary, and not on the operating budget. At go-live they route to a supervisor who already has a shift to run. The queue is where the savings go to die, and it is almost never named in the business case.
Pilot scope is a shift; production scope is a network and a peak. A model tuned on one building’s volume profile meets a different building’s dock schedule, a different labor mix, and a fourth quarter. Anything that was fit rather than reasoned degrades. If the pilot never ran through a peak, you have not tested the thing that will break.
The integration was the project all along. The model is rarely the hard part. The hard part is the WMS, the labor management system, the TMS, the order management system, and whatever middleware is holding the seams together — plus the fact that changing what the WMS is told changes what the engineered standard means. That is not an AI project. It is a systems project with a model in it, and it should be staffed and scheduled like one.
The baseline was wrong. Pilots are frequently measured against a period that included the attention of the project team, or against a pre-pilot baseline captured in a soft month. Then the productivity loss after go-live gets attributed to the technology when a meaningful part of it is the ordinary cost of a system cutover — a cost that is predictable, budgetable, and routinely left out of the model entirely.
The labor math moves under you. Deployment assumptions about headcount, shift structure, and task assignment are not purely operational choices in every building — they interact with what the labor agreement permits. A pilot in a non-represented site tells you very little about a rollout into a represented one, and the difference shows up as schedule, not as a line item.
What to put in the pilot before you sign it
If you take one thing from the audit above, take this: the failure rate you should care about is your own, and it is mostly determined before the pilot starts. Four things belong in the scope document.
- An exception rate target and a named owner for the queue, with the labor to work it costed into the business case rather than absorbed.
- A production-shaped scope — at minimum one building through one peak, with the messy category included on purpose.
- A baseline captured before the project team arrives, and a stated, budgeted allowance for the go-live dip so that it cannot later be argued about.
- Integration owned by the buyer, not the vendor, with the interface list written down. The vendor owns the model; you own the seams, and the seams are the schedule.
None of that is exotic. It is the same discipline any material handling capital request gets. The reason it often doesn’t get applied to AI projects is that AI projects tend to be sponsored out of a different part of the org than the one that will run them — which is, in the end, a much better explanation of pilot failure than any single statistic.
If you are sizing one of these and want the business case pressure-tested by someone who has approved this kind of capital and lived with the result, that is what the advisory work is for. More of this lane sits at AI & Operations.
If the pilot does convert, the next number that surprises people is the running cost. What an AI agent actually costs to run takes apart per-unit pricing, consumption billing, and who absorbs an overrun.
Colin Reed is an operations executive and independent consultant. He writes on applied AI in the physical economy — distribution, warehousing, fleet, and food service — from the seat that approves the capital and runs the P&L afterwards. Work with Colin.